Casing & tubular running

Run tubulars safely.
Verify every connection.

Tubular Running Services for conductor, casing, tubing and completion strings using mechanized handling, power tongs and monitored connection make-up.

Oilfield team reviewing the work plan at a drilling location

Service scope

Tubular running.
Connection integrity first.

Running equipment, handling tools and connection data aligned with the casing programme, rig interface and tubular specification.

SWIFIX supports Tubular Running Services (TRS) from pre-job engineering through string landing and close-out. The programme covers tubular tally and drift, connection-data review, handling and running-tool selection, power-tong make-up, torque-turn monitoring, fill-up and circulation, single-joint handling and final string landing. Operations can be configured for conductor, casing, liner, tubing and completion strings, including premium connections and controlled handling of corrosion-resistant alloy tubulars where required.

01

Tubular handling

Provide the specified elevators, spiders, slips, single-joint elevators, safety clamps and handling accessories for the tubular OD and weight.

02

Make-up & break-out

Use hydraulic power tongs with correct dies, backup equipment and connection-specific operating parameters.

03

Torque-turn monitoring

Monitor turns, shoulder response and final torque against the connection make-up criteria, with a traceable record for each joint.

04

Fill-up, circulate & land

Support controlled fill-up, circulation, reciprocation and landing while maintaining tally, string weight and connection records.

Execution sequence

From tally
to landed string.

A TRS sequence built around rig compatibility, tubular condition, correct make-up and full connection traceability.

01

Programme review

Confirm string design, tally, grade, weight, OD, drift, connection type, make-up specification and running sequence.

02

Equipment readiness

Inspect and function-test tongs, dies, elevators, spiders, slips, fill-up tools, torque-turn system and lifting accessories.

03

Rig-up & run

Interface with the rig floor, verify exclusion zones and communications, then handle, stab, make up and run each joint to programme.

04

Connection close-out

Deliver the final tally, torque-turn plots, rejected-connection record, equipment log and string-landing summary.

Start here

Let's discuss
your work scope.

Share the objective, location, timing and any known equipment requirements. We'll respond with a practical next step.

hello@swifixenergyservices.com+234 803 309 9170
Company's Address:
19 Road 4, Oginigba New Layout,
Trans Amadi, Port Harcourt,
Rivers State, Nigeria