Slickline services

Mechanical intervention.
Minimal wellsite footprint.

Slickline conveyance for completion maintenance, downhole valve manipulation, gauge surveys and fishing under live-well pressure control.

Oilfield intervention crew working around well equipment

Service scope

Completion access.
Precise mechanical work.

Single-strand wireline operations configured around the completion profile, well barriers and downhole task.

SWIFIX provides slickline intervention for routine completion servicing and remedial well work. The programme may include running and pulling lock mandrels, plugs, standing valves and gas-lift valves; shifting sliding sleeves; deploying memory gauges; gauging and broaching restrictions; bailing debris; and recovering downhole components. Each run is planned around the completion schematic, pressure-control stack, toolstring OD, jarring requirement and verified operating depth.

01

Completion equipment

Run and retrieve lock mandrels, blanking plugs, standing valves, equalizing devices and other wire-retrievable completion components.

02

Valve & sleeve manipulation

Set or pull gas-lift valves and shift compatible sliding sleeves using the specified kick-over, shifting or pulling tool.

03

Gauge & cleanout runs

Deploy gauge cutters, impression blocks, broaches, scrapers, bailers and magnets to confirm drift and remove accessible debris.

04

Surveys & fishing

Install memory pressure/temperature gauges and recover parted wire, dropped tools or completion components with suitable fishing assemblies.

Execution sequence

From barrier check
to tool return.

Every run follows an approved well programme, verified pressure-control arrangement and documented depth reference.

01

Programme & barriers

Confirm well status, completion profile, tubing pressure, fluid type, barrier philosophy and acceptance criteria for each run.

02

BHA & PCE selection

Configure rope socket, stem, jars, knuckle joint and service tool; select lubricator, stuffing box and wireline BOP requirements.

03

Rig-up & operate

Function-test and pressure-test the PCE, establish the depth datum, monitor line weight and execute controlled jarring or manipulation.

04

Run report

Record run sequence, maximum depth, tool response, recovered items, pressure observations and the status of the downhole objective.

Start here

Let's discuss
your work scope.

Share the objective, location, timing and any known equipment requirements. We'll respond with a practical next step.

hello@swifixenergyservices.com+234 803 309 9170
Company's Address:
19 Road 4, Oginigba New Layout,
Trans Amadi, Port Harcourt,
Rivers State, Nigeria