Well intervention

Restore well access.
Recover production.

Integrated light-well-intervention support for diagnostics, mechanical remediation, wellbore cleanout and production-restoration programmes.

Field service team standing beside intervention equipment in a workshop

Service scope

Intervention scope.
Matched to the well objective.

Conveyance, downhole tools, pumping and pressure control integrated into one executable well programme.

SWIFIX supports well intervention across slickline, electric line, coiled tubing and pumping services. Programmes are developed from the well history, production problem, completion architecture and barrier status, then configured for well integrity diagnostics, production logging, plug or valve work, scale and solids removal, perforating support, fluid circulation, nitrogen unloading or other approved remedial activity. The focus is to restore access or production while preserving well control and verified barriers.

01

Well diagnostics

Cased-hole logging, pressure and temperature surveys, production profiling, leak investigation and depth correlation.

02

Mechanical remediation

Plug setting or retrieval, sleeve shifting, downhole valve work, fishing and recovery of accessible completion components.

03

Wellbore cleanout

Coiled-tubing or pumped-fluid support for solids removal, scale treatment, circulation and preparation for the next operation.

04

Production restoration

Coordinate perforating, nitrogen unloading, flow-assurance treatment and post-intervention well return in line with the approved programme.

Execution sequence

From diagnosis
to restored access.

A single operating sequence connects the subsurface objective, well barriers, service spread and close-out data.

01

Define the objective

Review production history, completion schematic, pressure data, restrictions and the measurable success criteria for the intervention.

02

Engineer the programme

Select the conveyance method, BHA, pressure-control equipment, fluids, contingency tools and required third-party interfaces.

03

Verify readiness

Confirm barriers, permits, PCE tests, equipment certification, fluid volumes, communications and emergency-response arrangements.

04

Execute & evaluate

Control the operating envelope, capture real-time observations and issue a post-job report against the intervention objective.

Start here

Let's discuss
your work scope.

Share the objective, location, timing and any known equipment requirements. We'll respond with a practical next step.

hello@swifixenergyservices.com+234 803 309 9170
Company's Address:
19 Road 4, Oginigba New Layout,
Trans Amadi, Port Harcourt,
Rivers State, Nigeria