Wellhead maintenance

Protect the pressure envelope.
Maintain well integrity.

Preventive and corrective maintenance for casing heads, tubing heads, Christmas trees, valves, flanges, seals and wellhead control interfaces.

Technicians carrying out maintenance work on wellhead equipment

Service scope

Surface integrity.
Verified at the wellhead.

Inspection, servicing and pressure testing focused on leak prevention, valve operability and containment integrity.

SWIFIX supports wellhead and Christmas-tree maintenance from initial condition assessment through repair and pressure verification. The work scope can include master, wing and swab valve function checks; bonnet, stem, gate and seat inspection; seal and packing replacement; flange and stud-bolt inspection; grease and sealant injection; cavity flushing; leak rectification; pressure testing; and functional checks of surface safety valves and emergency-shutdown interfaces. All work is completed under an approved isolation and barrier plan.

01

Wellhead inspection

Inspect casing and tubing heads, spools, flanges, studs, outlets and tree components for leakage, corrosion, erosion and mechanical damage.

02

Valve maintenance

Service gate valves, stems, bonnets, seats, packing and actuators; flush cavities and apply the specified grease or sealant.

03

Pressure integrity

Perform body, seat and connection pressure tests to the approved procedure and record test pressure, hold time and observed leakage.

04

Safety-system checks

Function-test surface safety valves, hydraulic or pneumatic actuators, control lines, fusible loops and ESD shutdown response where included.

Execution sequence

From isolation
to pressure test.

Maintenance is sequenced around verified barriers, controlled disassembly, correct reassembly and documented integrity testing.

01

Isolate & depressurize

Confirm the barrier scheme, PTW, bleed-off points, trapped-pressure controls and zero-energy state before breaking containment.

02

Strip & inspect

Disassemble the approved components, clean cavities and sealing areas, and record condition, wear and replacement requirements.

03

Service & reassemble

Replace approved seals or packing, lubricate components and reassemble with the specified orientation and bolting procedure.

04

Test & hand over

Complete functional and pressure-integrity tests, reinstate the system and issue the maintenance and test report.

Start here

Let's discuss
your work scope.

Share the objective, location, timing and any known equipment requirements. We'll respond with a practical next step.

hello@swifixenergyservices.com+234 803 309 9170
Company's Address:
19 Road 4, Oginigba New Layout,
Trans Amadi, Port Harcourt,
Rivers State, Nigeria