Wireline & pipe recovery

Diagnose downhole conditions.
Recover the string.

Cased-hole electric-line and pipe-recovery services for depth correlation, well diagnostics and the controlled release of stuck or parted tubulars.

Wireline field equipment prepared for an oilfield intervention

Service scope

Downhole scope.
Engineered to the fish.

Toolstrings and recovery methods selected from the well schematic, tubular condition, pressure environment and recovery objective.

SWIFIX supports wireline intervention programmes for production diagnostics and the recovery of stuck or parted drillpipe, tubing and casing. Each scope is built from the completion schematic, wellbore geometry, fluid environment and known fish condition, then matched to depth correlation, free-point determination, string-shot back-off, cutting or severing and fishing requirements. Operations are executed through suitable pressure-control equipment with calibrated depth and line-tension monitoring and a complete post-job record.

01

Cased-hole diagnostics

CCL and gamma-ray depth correlation, pressure and temperature surveys, production logging and memory-gauge deployment where specified in the programme.

02

Free-point & back-off

Determine the free and stuck intervals, confirm neutral-point conditions and support controlled string-shot back-off at the selected connection.

03

Cutting & severing

Deploy the approved chemical, radial or mechanical cutting system to create a recoverable top on stuck drillpipe, tubing or casing.

04

Recovery & reporting

Coordinate fishing-tool selection, depth and tension records, run summaries and clear recommendations for the next recovery step.

Execution sequence

From correlation
to recovery.

A controlled sequence for locating, releasing and recovering the string while maintaining the well barrier envelope.

01

Well-data review

Review the well schematic, deviation survey, tubular tally, BHA history, fish description, fluid data and pressure-control requirements.

02

Toolstring design

Select the correlation package, free-point or cutting assembly, conveyance method, pressure-control stack and contingency tools.

03

Rig-up & execution

Rig up, function-test and pressure-test the PCE; correlate depth, confirm line tension and execute the approved recovery programme.

04

Post-job analysis

Issue run-by-run depths, tool response, recovery results, recovered-component details and recommended follow-on operations.

Start here

Let's discuss
your work scope.

Share the objective, location, timing and any known equipment requirements. We'll respond with a practical next step.

hello@swifixenergyservices.com+234 803 309 9170
Company's Address:
19 Road 4, Oginigba New Layout,
Trans Amadi, Port Harcourt,
Rivers State, Nigeria